Value | Category | Cases | |
---|---|---|---|
1 | None | 25 |
32.9%
|
2 | Micro-dam (Anestgna Gidib) | 6 |
7.9%
|
3 | River diversion on (Wonz Telefa) | 26 |
34.2%
|
4 | Pond (Kure) | 1 |
1.3%
|
5 | Water harvesting (Wuha Makor) | 4 |
5.3%
|
6 | Well (Gudigad Wuha) | 7 |
9.2%
|
7 | Stream (Minich) | 0 |
0%
|
8 | Other | 3 |
3.9%
|
9 | Generator | 1 |
1.3%
|
10 | Motor water | 3 |
3.9%
|
99 | Missing | 0 |
0%
|
Sysmiss | 3 |