| Value | Category | Cases | |
|---|---|---|---|
| EVAPORATION BASIN | 3 |
50%
|
|
| EVAPORATION BASIN IN THE LAND | 1 |
16.7%
|
|
| EVAPORATION BASIN OF CONCRETE | 1 |
16.7%
|
|
| I CALCULATE IN ORDER NOT TO WASTE WATER | 1 |
16.7%
|