| Value | Category | Cases | |
|---|---|---|---|
| 1 | Terracing | 65 |
4%
|
| 2 | Tree planting | 344 |
20.9%
|
| 3 | Conservation activities | 403 |
24.5%
|
| 4 | Preparing water harvesting pits | 119 |
7.2%
|
| 5 | Road construction | 239 |
14.5%
|
| 6 | Sewerage construction | 68 |
4.1%
|
| 7 | Preparing holes for tree plantation | 140 |
8.5%
|
| 8 | Trenches | 79 |
4.8%
|
| 9 | Wire mesh (Gabiyon ) | 20 |
1.2%
|
| 10 | Bridge construction | 32 |
1.9%
|
| 11 | Stone terracing | 115 |
7%
|
| 12 | Others | 19 |
1.2%
|
| Sysmiss | 2136 |