| Value | Category | Cases | |
|---|---|---|---|
| 1 | None | 25 |
36.8%
|
| 2 | Micro-dam (Anestgna Gidib) | 1 |
1.5%
|
| 3 | River diversion on (Wonz Telefa) | 31 |
45.6%
|
| 4 | Pond (Kure) | 1 |
1.5%
|
| 5 | Water harvesting (Wuha Makor) | 0 |
0%
|
| 6 | Well (Gudigad Wuha) | 6 |
8.8%
|
| 7 | Stream (Minich) | 4 |
5.9%
|
| 8 | Other | 0 |
0%
|
| 9 | Generator | 0 |
0%
|
| 10 | Motor water | 0 |
0%
|
| 99 | Missing | 0 |
0%
|