| Value | Category | Cases | |
|---|---|---|---|
| 1 | Terracing | 1589 |
69.1%
|
| 2 | Tree planting | 85 |
3.7%
|
| 3 | Conservation activities | 85 |
3.7%
|
| 4 | Preparing water harvesting pits | 60 |
2.6%
|
| 5 | Road construction | 201 |
8.7%
|
| 6 | Sewerage construction | 29 |
1.3%
|
| 7 | Preparing holes for tree plantation | 58 |
2.5%
|
| 8 | Trenches | 38 |
1.7%
|
| 9 | Wire mesh (Gabiyon ) | 17 |
0.7%
|
| 10 | Bridge construction | 14 |
0.6%
|
| 11 | Stone terracing | 86 |
3.7%
|
| 12 | Others(Specify) | 37 |
1.6%
|
| Sysmiss | 1531 |