Value | Category | Cases | |
---|---|---|---|
1 | REQUIRES TOO MUCH LABOR | 19 |
0.6%
|
2 | MATERIALS NOT AVAILABLE | 26 |
0.8%
|
3 | MATERIALS TOO COSTLY | 6 |
0.2%
|
4 | NO SOIL OR WATER EROSION PROBLEMS ON ANY PLOTS | 22 |
0.7%
|
5 | TOO RISKY/BENEFITS UNCLEAR | 2 |
0.1%
|
6 | OTHER (SPECIFY) | 1 |
0%
|
Sysmiss | 3102 |